# Schedule Chart
# 1. Overview
In the operation workbench, the scheduling information of all tasks and campaigns are displayed in the form of Gantt charts.
# 2. Usage Instructions
Display Content Scope
Ongoing tasks, campaigns, and tasks within campaigns are shown.
- "Finished" tasks are not displayed in the scheduling table.
- "Deleted", "Draft", "Pending", and manually triggered tasks are not shown in the scheduling table.
Period Switching
- Scheduling information is displayed from three time perspectives: week, month, and year.
View Switching
- The schedule chart can be viewed in two kinds of views: campaign view and task view:
- Campaign view: Shows the relationship between campaigns and the tasks within them.
- Task view: All tasks (regular tasks and tasks within campaigns) are mixed together.
Filtering
- Multiple filtering options are available to filter campaigns and tasks:
Campaign view: campaigns can be filtered by Creator, PushChannel, Campaign Name, Duration, and Campaign Type.
Task view: tasks can be filtered by Creator, PushChannel, and Groups options.